Items with process status receiving current date/time as due date/time
- Article Type: General
- Product: Aleph
- Product Version: 18.01
Description:
We have a small number of items with a process statusNB (around 850).
We have recently noticed that when checking items out that have a process status NB, the item receives a due date & time of the current date & time.
E.g. item 39097012649324 was checked out 2/25/2008 at 1:38pm and received the due date of 2/25/2008 at 1:38pm
The item should have received the due date 05/15/2008 at 23:59
The item was later recalled by p_cir_13 on 3/11/2008 at 7:30 am and received the new due date 3/11/2008 at 1:38pm
It should have been 14 days later, or 3/25/2008
I am trying to track down why the item process status seems to be affecting the due dates.
The example I have given is of an item status 02 which ordinarily would be Non-circ, but I have run multiple tests with item status 01 items which are circulating and the problem seems to occur only if the item has a process status of NB. I have not tried any other process statuses.
Summary:
Item status 01 + process status NB = due date/time is current date/time
Item status 01 + blank process status = due date is calculated according to tab16
Any hints? [ <Tania Fersenheim > ]
-------------------------------------------------------------------------------- [ <Randy Menakes > ]
[ <Randy Menakes > ]
[ <Jerry Specht > ]
[ <Jerry Specht > ]
Resolution:
[From site:]
It turned out the problem was the NB process status was set to circ = Y in tab15.eng so Aleph thought it should Circulate, but it could not find a rule in tab16 for the loan rules for item status 02 (non-circ).
It turns out that a group of status 02 (non-circ) items had been accidentally set to process status NB when they should not have been.
We fixed the items.
- Article last edited: 10/8/2013