    Alma Uptime Report for AP01 Instance (APAC) - Q2 2017

    Uptime Quarterly Reports are published each quarter to provide a comprehensive view of our uptime performance as measured over the last three (3) months and over the last twelve (12) months. The report measures our performance as defined in the Service Level Agreement.

     

    This document details the uptime report for the Alma AP01 in APAC. The instance your organization uses can be identified by the (Alma AP01 instance is ap01.alma.exlibris.com).

     

    The uptime measured on a rolling 12 month basis July 2016 - June 2017 is 99.89%

    The uptime measured on a rolling 3 month basis April 2017 - June 2017 is  99.78%

     

    Please note our System Uptime Status page, which allows our customers to view the current status of their instance/environment at any time, using the following link: http://status.exlibrisgroup.com

     

     

    Unscheduled downtime incidents in Q2 2017

    Date

    Start time

     [SGT]

    End time

    [SGT]

    Duration
    (minutes)

    Description

    April 07, 2017 12:18 PM 04:08 PM 230

    During an urgent and unexpected maintenance activity to replace a redundant network switch, a malfunction was triggered and caused both switches to fail. 

    Cisco has confirmed that this malfunction is the result of a bug.

    The malfunction caused a network outage in the switch, which serves all server connections to the network, including

    to the central storage server in the Ex Libris Singapore data center. 


    Manual intervention by Ex Libris engineers was needed and included a system restart and validation that both network and applications were functioning properly.

    June 03, 2017 14:03 PM 15:44 PM 101

    Due to a human error related to the change management process, the June release was installed on the environment a few hours earlier than usual and caused an outage at an unexpected time.

    It was found that the verification process that normally stops an installation from being performed in an unapproved window of time contained an error and therefore did not prevent the installation.

    Scheduled downtimes during maintenance windows in Q2 2017

    Start Date

    Start Time

    [SGT]

    End Time

    [SGT]

    Duration (Minutes)

    April 01, 2017 22:03 PM 22:14 PM 11
    May 06, 2017 22:01 PM 22:19 PM 18
    May 07, 2017 00:05 AM 00:13 AM 8
    May 14, 2017 00:12 AM 00:24 AM 12
    June 10, 2017 22:23 PM 22:37 PM 14
    June 17, 2017 23:20 PM 23:30 PM 10

     

    Total unscheduled downtime minutes during past 12 months

    Quarter

    Total unscheduled downtime in Quarter (minutes)

    Q3 2016 185
     Q4 2016 61
     Q1 2017 0
    Q2 2017 331

     

    How is Uptime Calculated?

    The uptime calculation is based on the following calculation (as defined in the Service Level Agreement):

    "Uptime" means the total period in minutes during which the Service is available for access and use during this period.

     

    Uptime Percentage” means Uptime expressed as a percentage, calculated in accordance with the following formula:   

      

     Uptime Percentage = X /(Y–Z) × 100    

    Where: 

      X = Uptime

      Y = Last 12 months period

      Z = The duration (in minutes) of any SLA Exclusions* during these 12 months

     

    *SLA exclusions are defined in the contract SLA (e.g. Scheduled maintenance, etc.)

     

    Further Information

    If you have any queries on the information within this report please contact Ex Libris through your usual channel.

    • Was this article helpful?