Skip to main content
ExLibris
  • Subscribe by RSS
  • Ex Libris Knowledge Center

    Primo Uptime Report for Primo MT CN01 Instance (China) - Q2 2022

    Uptime Quarterly Reports are published each quarter to provide a comprehensive view of our uptime performance as measured over the last three (3) months and over the last twelve (12) months. The report measures our performance as defined in the Service Level Agreement.

     

    This document details the uptime report for the  Primo MT CN01 in China.
     

    The uptime measured on a rolling 12 month basis July 2021 - June 2022 is 100%

    The uptime measured on a rolling 3 month basis  April 2022 - June  2022 is 100%

    Please note our System Uptime Status page, which allows our customers to view the current status of their instance/environment at any time, using the following link: http://status.exlibrisgroup.com

     

    clipboard_e6a0822b1b92eef5958480cfd72cd663e.png

    Unscheduled downtime incidents in Q2 2022

    Date

    Start time

     [CST]

    End time

    [CST]

    Duration
    (minutes)

    Description

             

    Scheduled downtimes during maintenance windows in Q2 2022 

    Start Date

    Start Time

    [CST]

    End Time

    [CST]

    Duration (Minutes)

    June 12, 2022 12:35 12:50 15

    Total unscheduled downtime minutes during the past 12 months

    Quarter

    Total unscheduled downtime in Quarter (minutes)

    Q3 2021 0
    Q4 2021 0
    Q1 2022 0
    Q2 2022 0

     

    How is Uptime Calculated?

    The uptime calculation is based on the following calculation (as defined in the Service Level Agreement):

    "Uptime" means the total period in minutes during which the Service is available for access and use during this period.

     

    Uptime Percentage” means Uptime expressed as a percentage, calculated in accordance with the following formula:   

      

     Uptime Percentage = X /(Y–Z) × 100    

    Where: 

      X = Uptime

      Y = Last 12 months period

      Z = The duration (in minutes) of any SLA Exclusions* during these 12 months

     

    *SLA exclusions are defined in the contract SLA (e.g. Scheduled maintenance, etc.)

     

    Further Information

    If you have any queries on the information within this report please contact Ex Libris through your usual channel.