Skip to main content
ExLibris

Knowledge Assistant

BETA
 
  • Subscribe by RSS
  • Back
    Voyager

     

    Ex Libris Knowledge Center
    1. Search site
      Go back to previous article
      1. Sign in
        • Sign in
        • Forgot password
    1. Home
    2. Voyager
    3. Knowledge Articles
    4. Closed Calendar with no end date gives RTE 65099 at Charge attempt

    Closed Calendar with no end date gives RTE 65099 at Charge attempt

    1. Last updated
    2. Save as PDF
    3. Share
      1. Share
      2. Tweet
      3. Share
    1. Additional Information
    • Article Type: General
    • Product: Voyager
    • Product Version: 7.0.1

    Problem Symptoms:
    * Active calendar for Circulation Policy Definition closed every day, no End Date, no open Exception Dates in future
    * Charge attempt in Circulation for day/hour/minute loan results in "Run-time error '65099': Connection timed out."
    * Possible that term loans can be charged.

    Cause:
    This behavior is the result of issue VYG-6017.

    Resolution:
    VYG-6017 is resolved for Voyager 9.1.1 and higher.

    Additional Information

    Replication steps:
    1. In SysAdmin > Circulation > Calendars
    1.a. Check that there are no open Exception dates in the future
    1.b. Set all Open and Closed times to Closed
    1.c. Check that calendar has no End Date.
    2. In SysAdmin > Circulation > Policy Definitions
    2.a. Set calendar from step 1 to be policy calendar
    2.b. Find example patron group A / item type A that has day loan
    3. In Circulation, charge item belonging to item type A to patron belonging to patron group A.
    4. Circulation will try for a while to charge the item before it fails with Run-time error '65099': Connection timed out.
    5. Click OK and Circulation closes.

    Workaround: Set calendar to be open for some period of time so that Circulation is able to assign a due date.

    Additional information:
    * Circulation is unable to assign a due date if all future dates for calendar are closed.
    * Defect is that in scenario above, result is run-time error rather than message indicating an issue with Circulation Calendar.
    * If Circulation Policy Definition matrix has term loan and there are future term loan dates in Calendar, term loans can be successfully charged with an override.

    Category: Circulation - Voyager

    Subject: Voyager


    • Article last edited: 8/6/2014
    View article in the Exlibris Knowledge Center
    1. Back to top
      • Clicking "Send via EDI" option in Voyager Acquisitions but nothing happens
      • Collection of Tomcat WebVoyage customizations
    • Was this article helpful?

    Recommended articles

    1. Article type
      Topic
      Language
      English
      Product
      Voyager
    2. Tags
      1. 7.0.1
      2. Circulation - Voyager
      3. contype:kba
      4. Prod:Voyager
      5. Type:General
      6. Voyager
    1. © Copyright 2025 Ex Libris Knowledge Center
    2. Powered by CXone Expert ®
    • Term of Use
    • Privacy Policy
    • Contact Us
    2025 Ex Libris. All rights reserved