    campusM NA01 - RCA - April 11, 2026

    1. Last updated
    2. Save as PDF
    3. Share
      1. Share
      2. Tweet
      3. Share
    New updates to this page are now published in the new Knowledge Portal. Learn more in the FAQ.

     

    1. Introduction
    2. Event Timeline
    3. Root Cause Analysis
    4. Technical Action Items and Preventive Measures
    5. Customer Communication
    6.  

    Introduction

    This document serves as a Root Cause Analysis for the CampusM service interruption experienced by few Ex Libris customers on January 9, 2025.
    The goal of this document is to share our findings regarding the event, specify the root cause analysis, outline actions to be taken to solve the event, as well as preventive measures Ex Libris is taking to avoid similar cases in future.

    Event Timeline

    Service interruption was experienced by a few Ex Libris customers served by the campusM instance in the Chicago Data Center during the following hours: 

    April 11, 2026, from 12:14 AM until 2:27 AM.

    During the event, the service was inaccessible.

    Root Cause Analysis

    Clarivate Engineers investigated this event to determine the root cause analysis with the following results:

    On April 11, all products hosted on DC04 experienced an interruption triggered by planned maintenance from our primary Internet Service Provider. Our systems are built with redundancy to automatically failover to a secondary provider; however, the primary ISP's maintenance protocol kept their foundational network routing signals (BGP session and default route) continuously active despite the underlying loss of connectivity. Because these routing signals never dropped, our network was unable to detect the link as down, which prevented the automatic failover from triggering as designed. To restore service, our network engineering team and on-site data center partners manually disconnected the primary link, successfully forcing all traffic to route through our fully operational secondary ISP.

    Technical Action Items and Preventive Measures

    Clarivate has taken the following action and preventive measures to avoid such an occurrence in future:

    The network team working to enhance our ISP failover mechanism to include more checks in order to determine if the line is down and trigger the failover accordingly.

    Customer Communication

    ExLibris is committed to providing customers with prompt and ongoing updates during Cloud events. Ongoing and prompt updates on service interruptions appear in the system status portal at this address: http://status.exlibrisgroup.com/

    These updates are automatically sent as emails to registered customers.

     

    View article in the Exlibris Knowledge Center
    1. Back to top
      • North America Data Center RCA March 5, 2018
      • campusM NA01 - RCA - April 13, 2026
    • Was this article helpful?

    Recommended articles

    1. Article type
      Topic
      Content Type
      Product Materials
      Language
      English
      Product
      Alma Specto
    2. Tags
      1. contype:prdctmt
      2. Root Cause Analysis
    1. © Copyright 2026 Ex Libris Knowledge Center
    2. Powered by NiCE Knowledge Management ®
    • Term of Use
    • Privacy Policy
    • Contact Us
    2025 Ex Libris. All rights reserved