Skip to main content
ExLibris
  • Subscribe by RSS
  • Ex Libris Knowledge Center

    Primo Uptime Report for Primo MT EU02 Instance (Europe) – Q3 2019

    Uptime Quarterly Reports are published each quarter to provide a comprehensive view of our uptime performance as measured over the last three (3) months and over the last twelve (12) months. The report measures our performance as defined in the Service Level Agreement.

     

    This document details the uptime report for the Primo MT EU02 in Europe.

     

    The uptime measured on a rolling 12 month basis October  2018 - September   2019 is 99.95%

    The uptime measured on a rolling 3 month basis July 2019 - September  2019 is 100%

     

    Please note our System Uptime Status page, which allows our customers to view the current status of their instance/environment at any time, using the following link: http://status.exlibrisgroup.com

     

     

    clipboard_ea6a3f7a63e1c75a78040d67804da6293.png

    Unscheduled downtime incidents in Q3 2019

    Date

    Start time

     [CET]

    End time

    [CET]

    Duration
    (minutes)

    Description

             

    Scheduled downtimes during maintenance windows in Q3 2019

    Start Date

    Start Time

    [CET]

    End Time

    [CET]

    Duration (Minutes)

    August 4, 2019 01:57 AM 02:03 AM 6

     

    Total unscheduled downtime minutes during past 12 months

    Quarter

    Total unscheduled downtime in Quarter (minutes)

    Q4 2018 215
    Q1 2019 5
    Q2 2019 11
    Q3 2019 0

     

    How is Uptime Calculated?

    The uptime calculation is based on the following calculation (as defined in the Service Level Agreement):

    "Uptime" means the total period in minutes during which the Service is available for access and use during this period.

     

    Uptime Percentage” means Uptime expressed as a percentage, calculated in accordance with the following formula:   

      

     Uptime Percentage = X /(Y–Z) × 100    

    Where: 

      X = Uptime

      Y = Last 12 months period

      Z = The duration (in minutes) of any SLA Exclusions* during these 12 months

     

    *SLA exclusions are defined in the contract SLA (e.g. Scheduled maintenance, etc.)

     

    Further Information

    If you have any queries on the information within this report please contact Ex Libris through your usual channel.