p_manage_17 Help should indicate need to run following p_manage_02
- Article Type: General
- Product: Aleph
- Product Version: 20
Description:
Currently the p-manage-17.html Help says:
"Run this service after conversions or if you suspect that there is a problem with the filing of long headings. In addition, ..."
This needs to be corrected to the following:
"Run this service after running p_manage_02, or if you suspect that there is a problem with the filing of long headings. In addition, ..."
There is some logic in the $aleph_proc/p_manage_02 which will set the last-long-acc-number if “Duplicate mode” = Y (and p_manage_02_x is therefore executed), but, for the reasons described in KB 5709, p_manage_02 should be run only with “Duplicate mode” = N. Therefore, p_manage_17 needs to be executed following p_manage_02.
"Conversions" would always involve running p_manage_02. Therefore, with "after running p_manage_02" inserted, "after conversions" becomes extraneous and confusing -- and I have omitted it.
Resolution:
Corrected by v21 rep_change 161. The p_manage_17 service help (p-manage-17.html) has been corrected.
- Article last edited: 10/8/2013