Change physical items job : There was a POL linked to a holding record > After the job, the POL link is broken and a new Holding that is created by the job is not linked to POL. Why?
- Article Type: Q&A
- Product: Alma
Question
Change physical items job: There was a POL linked to a holding record > After the job, the POL link is broken and a new Holding that is created by the job is not linked to POL. Why?
Answer
The link is broken by design, because the POL can be linked to several Holdings and automatic change will produce wrong links together with the true one.
The link to POL should be done manually when the job is finished via List of Holdings > Actions > Associate a PO Line.
As a workaround for this issue, run "Change holding information" job instead of "Change items information" job.
- Article last edited: 6/8/2014