Skip to main content
ExLibris

Knowledge Assistant

BETA
 
  • Subscribe by RSS
  • Back
    Aleph

     

    Ex Libris Knowledge Center
    1. Search site
      Go back to previous article
      1. Sign in
        • Sign in
        • Forgot password
    1. Home
    2. Aleph
    3. Knowledge Articles
    4. Shipped items are receiving the incorrect due date

    Shipped items are receiving the incorrect due date

    1. Last updated
    2. Save as PDF
    3. Share
      1. Share
      2. Tweet
      3. Share
    No headers
    • Article Type: General
    • Product: Aleph
    • Product Version: 19.01

    Description:
    Problem Description:
    Shipped items are receiving the incorrect due date.

    Actual Results:
    When an item with a shorter loan period is shipped in ILL after an item with a longer loan period has already been shipped, and the PC server has not been restarted, the longer due date is applied

    Expected Results:
    When an item with a shorter loan period is shipped in ILL after an item with a longer loan period has already been shipped, and the PC server has not been restarted, the correct due date should be applied

    Resolution:
    Customer confirmed no longer occurs in version 20.


    • Article last edited: 10/8/2013
    View article in the Exlibris Knowledge Center
    1. Back to top
      • Shipment amount in an EDI invoice
      • Short bib 264 year display problem in 008 using fast cataloging
    • Was this article helpful?

    Recommended articles

    1. Article type
      Topic
      Language
      English
      Product
      Aleph
    2. Tags
      1. 19.01
      2. contype:kba
      3. Prod:Aleph
      4. Type:General
    1. © Copyright 2025 Ex Libris Knowledge Center
    2. Powered by CXone Expert ®
    • Term of Use
    • Privacy Policy
    • Contact Us
    2025 Ex Libris. All rights reserved