Skip to main content
ExLibris

Knowledge Assistant

BETA
  • Subscribe by RSS
  • Back
    Voyager

     

    Ex Libris Knowledge Center
    1. Search site
      Go back to previous article
      1. Sign in
        • Sign in
        • Forgot password
    1. Home
    2. Voyager
    3. Knowledge Articles
    4. GDC and BulkImport simultaneously?

    GDC and BulkImport simultaneously?

    1. Last updated
    2. Save as PDF
    3. Share
      1. Share
      2. Tweet
      3. Share
    1. Question
    2. Answer
    3. Additional Information
    • Article Type: Q&A
    • Product: Voyager
    • Product Version: 8.1.1

    Question

    Can we run Global Data Change (GDC) jobs and BulkImport jobs simultaneously?

    Answer

    You should avoid running GDC and BulkImport jobs simultaneously, as both processes can be resource-intensive, and issues may arise if both processes attempt to update/overlay the same record(s).

    Additional Information

    See Global Data Change Document, "IMPORTANT - Before You Begin" section, which covers system prerequisites, best practices and other considerations for planning data changes.

    Category: Global data change (GDC)


    • Article last edited: 11/25/2013
    View article in the Exlibris Knowledge Center
    1. Back to top
      • Fund snapshot acqjob.log error "Failure retrieving parent fund information"
      • GDC appears successful, after records correct, but change not reflected in database
    • Was this article helpful?

    Recommended articles

    1. Article type
      Topic
      Language
      English
      Product
      Voyager
    2. Tags
      1. 8.1.1
      2. contype:kba
      3. Global data change (GDC)
      4. Prod:Voyager
      5. Type:Q&A
    1. © Copyright 2025 Ex Libris Knowledge Center
    2. Powered by CXone Expert ®
    • Term of Use
    • Privacy Policy
    • Contact Us
    2025 Ex Libris. All rights reserved