Problem Symptoms
The Claim list shows journal titles whose items have been received; their arrival date exists in the item record
Cause
These two POL parameters cause Alma to think Claim time is due:
- The "Expected Receipt Date" was either in the very past or was blank
- The "Subscription interval" was not synchronized with the serial's periodicity (e.g. it was set to 60 instead of 360 for an annual)
Secondly, items were not received in the Receive workbench
Resolution
First, ensure that items are received via the Receive workbench
Secondly, update the above fields in the PO Line record
Additional Information
The expected date can be updated directly from the Claim workbench:
- Select the Alma menu > Claim (under: Acquisition)
- Use the "Find" button to retrieve the POL
- Select the button "Change Expected Date"