Skip to main content
ExLibris
  • Subscribe by RSS
  • Ex Libris Knowledge Center

    Changing Loan Due Dates in Bulk

    Translatable
    To change due dates in bulk, you must have one of the following roles:
    • Fulfillment Administrator
    • General System Administrator
    This section describes how to change the date for all items in a library that are due within the same date range (From/To) with a job that runs on demand. This process is applied to loans for which the status is active and is not recalled. There are no other restrictions for changing the due date based on the status.
    If there is an accruing fine for a loan that is overdue, and the due date is changed so that the loan is no longer overdue, the fine will be dismissed. It will not be charged when item is returned.
    Bulk Change Due Date Page
    To change loan due dates in bulk:
    1. On the Bulk Change Due Date page (Fulfillment > Advanced Tools > Bulk Change Due Dates), enter the relevant information in the displayed fields, as described in the following table.
      Bulk Change Due Date Fields
      Field Description
      Library
      (Required)
      Select the library whose items’ due dates you want to change.
      Location Select a location (from a list predefined by an administrator; see Configuring Physical Locations) within the specified library. If no location is selected, the job handles all locations for the selected library.
      Material type Select a type of item within the specified library. If no material type is selected, the job handles all material types.
      User group Select a user group for which you want to change the due date. If no user group is selected, the job handles all user group.
      From due date
      (Required)
      Select the beginning date range from the calendar dialog box and optionally, enter a time in the At field.
      If the corresponding At field is not specified, the time is set to 00:00.
      To due date
      (Required)
      Select the end date range from the calendar dialog box and optionally, enter a time in the At field.
      If the corresponding At field is not specified, the time is set to 23:59.
      New due date
      (Required)
      Select the new To due date from the calendar dialog box and optionally, enter a time in the At field.
    2. Click Change Bulk Due Date, and click Confirm in the confirmation dialog box. The list of jobs and their statuses appear in the table on the bottom of the page.
      The Bulk Change Due Date page displays the columns containing information on the bulk change jobs that have run. The columns are described in the following table:
      Bulk Change Due Date Columns
      Column Description
      Job ID A numerical identification number of the job
      Status The status of the job
      Creator The user who created the job
      Time Started The date and time on which the job started
      Time Ended The date and time on which the job ended
      Entities Finished The number of items in the job for which the due date change completed successfully
      Entities Failed The number of items in the job for which the due date change failed
      Click View to view a report of the job. The Job Report page appears, displaying job details.
      Job Report Page
      Click Export to Excel to export the report data to Excel for analysis.
    Changing a due date for one user’s loans manually will create only a single Due Date Change letter for all affected loans. Changing a due date in bulk will send the letter out once per affected loan, meaning that users with multiple loans will get multiple letters.
    A Bulk Change Due Date demand job is one method that can be used when due dates extend beyond the end of a semester and must be shortened to the end of the semester. For more information, see How to Make Items Have Due Dates at the End of the Semester.